Concept of Operation and Control System on Yunnan New Power System

Waisheng ZHENG, Yiping CHEN, Baorong ZHOU

South Power Sys Technol ›› 2022, Vol. 16 ›› Issue (9) : 83-89.

PDF(2915 KB)
Home Journals Southern Power System Technology
Southern Power System Technology

Abbreviation (ISO4): South Power Sys Technol      Editor in chief:

About  /  Aim & scope  /  Editorial board  /  Indexed  /  Contact  / 
PDF(2915 KB)
South Power Sys Technol ›› 2022, Vol. 16 ›› Issue (9) : 83-89. DOI: 10.13648/j.cnki.issn1674-0629.2022.09.010
Original article

Concept of Operation and Control System on Yunnan New Power System

Author information +
History +

Abstract

With the massive integration of renewable energy during the 14th Five-Year Plan, Yunnan Power System changes from the traditional power system based on hydro-power to the new power system based on wind and solar seasonally, which leads to the challenges of operation scenarios with system non-synchronous penetration (SNSP) larger than 60% in dry season and intermittent shortage of flexible reserves. In this paper, operation scenarios of high SNSP in some typical independent synchronous power systems in the world are analyzed, the main operation problems and corresponding measures are summarized. Based on the simulation and analysis of Yunan Power System high SNSP scenario in 2025, several suggestions on constructing an operation and control system for Yunnan new power system are proposed.

Key words

new power system / operation and control system / monitor and control index / frequency stabilization / active power coordinated dispatch

Cite this article

Download Citations
Waisheng ZHENG , Yiping CHEN , Baorong ZHOU. Concept of Operation and Control System on Yunnan New Power System[J]. Southern Power System Technology. 2022, 16(9): 83-89 https://doi.org/10.13648/j.cnki.issn1674-0629.2022.09.010

References

[1]
文云峰, 杨伟峰, 汪荣华, 等. 构建100%可再生能源电力系统述评与展望[J]. 中国电机工程学报, 2020, 40(6): 1843-1856.
WEN Yunfeng, YANG Weifeng, WANG Ronghua, et al. Review and prospect of toward 100% renewable energy power systems[J]. Proceedings of the CSEE, 2020, 40(6): 1843-1856.
[2]
IRENA. Renewable capacity statistics 2021 international renewable energy agency (IRENA)[R]. Abu Dhabi: IRENA, 2021.
[3]
薛晨, 任景, 马晓伟, 等. 面向高比例新能源消纳的西北调峰辅助服务市场机制及实践[J]. 中国电力, 2021, 54(11): 19-28.
XUE Chen, REN Jing, MA Xiaowei, et al. Mechanism of peak regulation auxiliary electricity market in the presence of high-penetration renewable energy and its practice in northwest China[J]. Electric Power, 2021, 54(11): 19-28.
[4]
谢惠藩, 徐光虎, 李鹏, 等. 多直流互联异步电网中直流频率限制控制的应用研究[J]. 南方电网技术, 2020, 14(5):9-15.
XIE Huifan, XU Guanghu, LI Peng, et al. Application research of frequency limit control on multi-HVDC asynchronous interconnection network[J]. Southern Power System Technology, 2020, 14(5):9-15.
[5]
陈亦平, 李崇涛, 杨若朴, 等. 云南异步电网中频率振荡的分段线性模型分析方法[J]. 电力系统自动化, 2020, 44(6):186-193.
CHEN Yiping, LI Chongtao, YANG Ruopu, et al. Analysis method of piecewise linear model for frequency oscillation in asynchronous power grid of Yunnan in China[J]. Automation of Electric Power Systems, 2020, 44(6):186-193.
[6]
杨蕾, 黄伟, 张丹, 等. 异步联网下云南电网低频与超低频振荡综合抑制策略[J]. 电力系统保护与控制, 2021, 49(11):133-140.
YANG Lei, HUANG Wei, ZHANG Dan, et al. Comprehensive suppression strategies for low frequency and ultra-low frequency oscillations of the Yunnan Power Grid under asynchronous interconnection[J]. Power System Protection and Control, 2021, 49(11):133-140.
[7]
周智行, 石立宝, 陈义宣. 异步联网下云南电网高频切机优化配置方案[J]. 电力系统自动化, 2020, 44(20):86-93.
ZHOU Zhihang, SHI Libao, CHEN Yixuan. Optimal configuration scheme of over-frequency generator tripping for Yunnan Power Grid of China with asynchronous interconnection[J]. Automation of Electric Power Systems, 2020, 44(20):86-93.
[8]
杜斌, 张丹, 张军民, 等. 异步联网后云南电网的稳定特性与控制措施[J]. 南方电网技术, 2016, 10(7):13-16.
DU Bin, ZHANG Dan, ZHANG Junmin, et al. Stability characteristics and control measures of Yunnan Power Grid after asynchronous interconnection[J]. Southern Power System Technology, 2016, 10(7):13-16.
[9]
付超, 张丹, 柳勇军, 等. 云南电网与南方电网主网异步联网实施阶段的系统风险分析[J]. 南方电网技术, 2016, 10(7):24-28.
FU Chao, ZHANG Dan, LIU Yongjun, et al. System risk analysis on implementation stage of asynchronous interconnection of Yunnan Power Grid and main grid of CSG[J]. Southern Power System Technology, 2016, 10(7):24-28.
[10]
李相俊, 马会萌, 姜倩. 新能源侧储能配置技术研究综述[J]. 中国电力, 2022, 55(1): 13-25.
LI Xiangjun, MA Huimeng, JIANG Qian. Review of energy storage configuration technology on renewable energy side[J]. Electric Power, 2022, 55(1): 13-25.
[11]
张东辉, 康重庆, 卢洵, 等. 高比例新能源系统中储能配置规模论证[J]. 南方电网技术, 2022, 16(4):3-11.
ZHANG Donghui, KANG Chongqing, LU Xun, et al. Demonstration on the scale of energy storage deployment in high-proportion new energy power system[J]. Southern Power System Technology, 2022, 16(4):3-11.
[12]
卓振宇, 张宁, 谢小荣, 等. 高比例可再生能源电力系统关键技术及发展挑战[J]. 电力系统自动化, 2021, 45(9): 171-191.
ZHUO Zhenyu, ZHANG Ning, XIE Xiaorong, et al. Key technologies and developing challenges of power system with high proportion of renewable energy[J]. Automation of Electric Power Systems, 2021, 45(9): 171-191.
[13]
朱轶伦, 张东波, 陈新建, 等. 计及频率特性的高比例可再生能源电力系统概率潮流分析[J]. 浙江电力, 2021, 40(5):7-13.
ZHU Yilun, ZHANG Dongbo, CHEN Xinjian, et al. Probabilistic power flow analysis of high-proportion renewable energy power system considering frequency characteristics[J]. Zhejiang Electric Power, 2021, 40(5):7-13.
[14]
KROPOSKI B, JOHNSON B, ZHANG Y, et al. Achieving a 100% renewable grid: operating electric power systems with extremely high levels of variable renewable energy[J]. IEEE Power and Energy Magazine, 2017, 15(2): 61-73.
[15]
MILANO F, DORFLER F, HUG G, et al. Foundations and challenges of low-inertia systems[C]// IEEE 2018 Power Systems Computation Conference, June 11-15, 2018, Dublin, Ireland. New York: IEEE, 2018.
[16]
AEMO. Renewable integration study: stage 1 report: enabling secure operation of the NEM with very high penetrations of renewable energy[R]. Melboume: AEMO, 2020.
[17]
AEMO. Maintaining power system security with high penetrations of wind and solar generation[R]. Melboume: AEMO, 2019.
[18]
MATEVOSYAN J, HUANG S H, DU P, et al. Operational security: the case of Texas[J]. IEEE Power and Energy Magazine, 2021, 19(2): 18-27.
[19]
ERCOT. Dynamic stability assessment of high penetration of renewable generation in the ERCOT Grid[R]. Texas: ERCOT, 2018.
[20]
Eirgrid. Full technical report: shaping our electricity future[R]. Ireland: Eirgrid, 2021.
[21]
刘娟, 张秀钊, 王志敏, 等. 云南电力发展存在问题与未来新型电力系统发展建议[J]. 云南电力技术, 2021, 49(4):2-5.
LIU Juan, ZHANG Xiuzhao, WANG Zhimin, et al. Problems in Yunnan electric power development and suggestions for the development of new electric power system in the future[J]. Yunnan Electirc Power Technology, 2021, 49(4):2-5.
[22]
王子石, 邢玉辉, 杨知方, 等. 云南电力市场建设的实践及展望[J]. 中国电力, 2021, 54(6): 12-21.
WANG Zishi, XING Yuhui, YANG Zhifang, et al. Practice and prospect of electricity market reform in Yunnan[J]. Electric Power, 2021, 54(6): 12-21.
[23]
徐攀腾, 朱博, 宋述波, 等. 多回直流闭锁故障下云南电网频率协调控制研究[J]. 电力学报, 2021, 36(4):306-314,370.
XU Panteng, ZHU Bo, SONG Shubo, et al. Research on frequency coordinated control of Yunnan Power Grid under multi-circuit DC blocking fault[J]. Journal of Electric Power, 2021, 36(4):306-314,370.
[24]
伍阳阳, 陈亦平, 李胜男, 等. 云南新能源高占比特性分析与2025年应对措施[J]. 云南电力技术, 2021, 49(5):28-32.
WU Yangyang, CHEN Yiping, LI Shengnan, et al. Analysis of high proportion characteristics of new energy in Yunnan and countermeasures in 2025[J]. Yunnan Electirc Power Technology, 2021, 49(5):28-32.
[25]
蔡葆锐, 曾丕江, 何金定, 等. 考虑频率安全约束的云南电网新能源运行边界研究[J]. 云南电力技术, 2021, 49(5):17-22.
CAI Baorui, ZENG Pijiang, HE Jinding, et al. Research on new energy operation boundary of Yunnan Power Grid considering frequency security constraint[J]. Yunnan Electirc Power Technology, 2021, 49(5):17-22.
[26]
ERCOT. Inertia: Basic concept and impacts on the ERCOT Grid[R]. Texas: ERCOT, 2018.
[27]
WALL P, BOWEN A, GEANEY C, et al. Common mode oscillations on the power system of Ireland and Northern Ireland[C]. Proceedings of 18th Wind Integration Workshop, October 16-18, 2019, Dublin, Ireland.

Funding

National Key Research and Development Program of China(2021YFB2400905)
Science and Technology Project of China Southern Power Grid Co., Ltd.(ZDKJXM20210034)